Bucharest Subway, Line 5

RAILWAYS AND SUBWAYS

#ROMANIA
#METRO SYSTEMS
Project's overview
Metros

Romania

Completed
Metropolitana di Bucarest, Linea 5

The project for Lot 1 (Raul Doamnei Station-PS Opera shaft) of Bucharest Subway, Line 5 foresaw construction of 12.5 kilometres (2 lines of 6.22 km each) of new line running completely underground and built using a EPB TBM, along the Drumul Taberei-Pantelimon section. The line is designed featuring 9 stations (total length: 1,372 m) and a double track tunnel (823m). 

The underground stations are located in correspondence with streets served by surface public transportation or streets of major local importance to permit an easy transfer between underground and surface transportation. 

Connection with the existing underground network is ensured at the Eroilor station, by means of a pedestrian underpass: passengers on underground line 5 will have direct access to lines 1 and 3 of the underground, and a supplementary transfer to lines 2 and 4 of the underground.
 

Technical data

+ + +

Concrete (m3) 

+ + +

Steel (tons)

+ + +

Underground excavations (m3)

Sustainable KPI

+ + +

Avoided C02 emissions (kg/day)

+ + +

Avoided nox emissions (kg/day)

+ + +

Avoided volatile organic compounds emissions (kg/day)

Bucharest Subway, Line 5

Information material - Bridge project over the Strait of Messina
(*) Required information