Project's overview
Roads and Highways
Italy
Completed
The main objectives of the work were:
- the creation of an alternative motorway road system to the Mestre ring road;ù
- the separation of the traffic flows passing through from those of the Mestre Venice urban system;
- reorganisation of the motorway system and ordinary road network for the Padua-Treviso-Venice area.
The new Pianiga-Quarto d’Altino route is approximately 33 km and in a very urbanised area.
The minimum size of the motorway carriageways, which include three lanes plus a hard shoulder in each direction, is 32.5 m.
The main works included in the Definitive Project are those described below:
- 8 sections in trenches, of which 7 are partly covered, with man-made tunnels between 100 and 445 m long, with an overall development between underground and trenches of approximately 9.5 km;
- 14 raised sections, for an overall development of approximately 22 km;
- 4 viaducts, for an overall length of approximately 1.5 km;
- 4 man-made tunnels constructed using prefabricated concrete structures and fixtures under the existing railway lines;
- 4 river crossings with single span bridges (between 25 and 35 m long);
- 14 overpasses and 16 underpasses for the motorway;
- 3 existing watercourse siphon works;
- 3 intermediate motorway toll booths;
- 3 intersections and new barriers on the A4 and A27 motorways.
Technical data
+ + +
m3 Concrete
+ + +
m3 Road superstructure and surfaces
+ + +
ton Steel for sheet piles