Yaciretà Hydroelectric Plant (upgrade)

DAMS, HYDROELECTRIC POWER PLANTS

Project's overview
Dams, hydroelectric power plants

Paraguay

In progress
img

The project foresees the performance of works to upgrade the Yaciretà Hydroelectric Power Plant on Río Paraná. The contract covers all the civil works and some electromechanical works to install three additional Kaplan turbines in the existing hydroelectric power plant to increase its installed capacity by 270 MW for an average annual energy output of 1,700 GWh.

KPI

Technical data

+ + +

Concrete (m3)

+ + +

Steel (t)

+ + +

m3 Rockfil (Cofferdam break waves)

+ + +

m3 Open Excavations (Embankment)

Yaciretà Hydroelectric Plant (upgrade)

Information material - Bridge project over the Strait of Messina
(*) Required information